Study of the potential of anaerobic digestion technologies implementation in agriculture of Ukraine
(jointly with Renewable Energy Agency (REA))
Period: 2009 - 2010
Investigation of methane generation processes in anaerobic bioreactors
Period: 2009 - 2010
Project description: Creation of experimental anaerobic bioreactors for organic material of plant and animal origin destruction with biogas generation. Investigation and optimization of methane generation processes at processing of monosubstrates and polycomponent organic mixtures, development of technological regulations for biogas units operation.
Construction of biogas collection and utilization systems at MSW landfills in Ukraine
Execution period: 07-12/2009
Objective: Selection of technological schemes and circuitries for design of full-scale collection systems
Project description:
The Project consists of developing a Landfill Gas collection and flaring system with an opportunity of its further energy utilization in order to avoid emissions of methane being released into the atmosphere (JI project)
Feasibility study – LFG utilization Rivne MSW Landfill, Ukraine
(jointly with Renewable Energy Agency (REA))
Execution period: 2009-2011
Objective: to perform an assessment of the Landfill site and amount of LFG available and the options for the LFG utilization at Rivne MSW Landfill.
Project description:
Evaluation of the LFG quality and availability at the Rivne landfill through a pump test based on three-wells limited collection system and open flare; evaluation of the technical and economical options for the implementing of full-scale LFG recovery system; evaluation of the available LFG utilization options, including flaring, electricity generation and direct LFG use.
Assessment of potential and modelling of gas generation at MSW landfills in Ukraine
(jointly with Renewable Energy Agency (REA))
Objection: Quantitive assessment of biogas collection at MSW landfills
Activities: Short-term and long term pump tests
Heating of the production building by infrared heaters on LFG at MSW landfill of Khmel’nyts’kyi city
Execution period: 06–12/2009
Objective: Installation of the LFG collection wells, gas treatment system and heaters at a landfill facility in Ukraine based on LFG
Project description:
Project includes an installation of infrared heaters at a landfill facility in the Ukraine based on LFG.
Construction of biogas collection and utilization systems at Chernihiv MSW landfill
Execution period: 04/2010-2011
Objective: selection of technological schemes and circuitries for design of full-scale collection systems
Project description:
Design of collection system at municipal solid waste landfill of Сhernihiv city
Collection and utilization of LFG at MSW landfills of Lugansk city
Execution period: 2002–2003
Collection and utilization of LFG at MSW landfill of Alushta town
Execution period: 2008
Collection and utilization of LFG at MSW landfill of Yalta town
Execution period: 2008