Assessment of potential and modelling of gas generation at MSW landfills in Ukraine

(jointly with Renewable Energy Agency (REA))

Objection: Quantitive assessment of biogas collection at MSW landfills

Activities: Short-term and long term pump tests

Short-term pump test at MSW landfill of Chernivtsi city

Place of implementation: MSW landfill of Chernivtsi city, UkraineAssessment of potential and modelling of gas generation at Chernovtsy landfill 

Execution period: 07/2007 

Main parameters of test LFG collection system

Number of wells:

3

Average LFG flow rate:

40 m3/h

Average CH4 content in LFG:

40,0%

Utilization of LFG: Combustion in a flaring stack

Main results of modelling

Average LFG flow rate for the period 2010 2012:

600-750 m3/h

GHG emission reductions into the atmosphere for 2010-2012:

50 th. t СО2-eq/yr

Long-term pump test at MSW landfill of Mariupol city

Assessment of potential and modelling of gas generation at Mariupol landfillPlace of implementation: MSW landfill of Mariupol city, Ukraine

Execution period: 08-09/2008 

Main parameters of test LFG collection system

Number of wells:

3

Average LFG flow rate:

30 m3/h

Average CH4 content in LFG:

43,0%

Utilization of LFG: Combustion in a flaring stack

Main results of modelling

Average LFG flow rate for the period 2010 2012:

400-600 m3/h

GHG emission reductions into the atmosphere for 2010-2012:

30,0 th. t СО2-eq/yr




Random pair of projects

Ukraine energy efficiency programme (UKEEP)

Period: 2006 - ongoingSEC "Biomass" experts have been performing technical consultancy services for over 5 years under UKEEP. UKEEP is a credit facility developed by the European Bank for Reconstruction...

Read more

Conference "Biomass for Energy"

Interesting at web-site


SEC "Biomass" Materials:  statistical and analytical material, articles in scientific and popular editions.

Random articles

YouTube
Facebook