Heating of the production building by infrared heaters on LFG at MSW landfill of Khmel’nyts’kyi city
Objective: Installation of the LFG collection wells, gas treatment system and heaters at a landfill facility in Ukraine based on LFG
Project description:
Project includes an installation of infrared heaters at a landfill facility in the Ukraine based on LFG.
Project tasks:
Task 1 provided training for the Ukrainian team members on landfill gas operations and to conduct site visits to operating landfill gas projects in the U.S.
Task 2 was to identify candidate landfills within the Ukraine at which a LFG powered infrared heater project would be feasible and to conduct the project negotiations.
Task 3 was the installation of the LFG collection wells, gas treatment system and heaters.
Task 4 was to present the project outcomes domestically and internationally.
Project activities:
- Landfill investigation, LFG model and feasibility study;
- Design and installation of gas collection and treatment system on Khmelnitskiy landfill;
- Installation of infrared heaters for repair shop heating on Khmelnitskiy landfill;
- Measurements and monitoring of gas collection and utilization system;
- Dissemination of information about the project by means of international conference, seminars, round tables, training courses.
Place of implementation: MSW landfill of Khmel'nyts'kyi city, Ukraine
Project financing: Environmental Protection Agency, United States of America (US EPA); Methane to Markets Partnership (M2M))
Main parameters of demonstration project
|
Number of wells: |
3 |
|
Average LFG flow rate: |
40-60 m3/h |
|
Average LFG flow rate: |
45-50% |
Utilization of LFG: 4 infrared heaters BH 30 UT with total capacity of 120 kW, combustion in a flaring stack.