Collection and utilization of LFG at MSW landfills of Lugansk city

Collection and utilization of LFG at MSW landfills of Lugansk cityExecution period: 2002–2003 

Objective: Construction and testing of demonstration LFG collection and utilization systems

Place of implementation: MSW landfill of Lugansk city, Ukraineа

Project financing: : Environmental Protection Agency, United States of America(US EPA), EcoLinks Challenge Grant #CG5-UA-31

Main parameters of demonstration LFG collection system

Number of wells:

3

Average LFG flow rate:

90 m3/h

Average CH4 content in LFG:

50%

Utilization of LFG: Mini-CHP with capacity of 30 kW, combustion in a flaring stack 

Random pair of projects

Seventh framework program of the European commission: Biomass Energy Europe

Period: 1 March 2008 - 30 November 2010.The overall objective of the project “Biomass Energy Europe” is to improve the accuracy and comparability of future biomass resource assessments for energy...

Read more

Feasibility study of Zaporizhzhya district heating system reconstruction

Project duration: 2011 - p.t. Financing organization/partner: European Bank of Reconstruction and Development. Project summary:The project framework includes technical assessment of possibility of alternative energy sources implementation at the district heating system...

Read more

Conference "Biomass for Energy"

Interesting at web-site


SEC "Biomass" Materials:  statistical and analytical material, articles in scientific and popular editions.

Random articles

YouTube
Facebook