Feasibility study of «Methane Gas Utilization Project at Bortnichi Waste Water Treatment Plant in Kiev»

 for Japan JI program

Feasibility study of «Methane Gas Utilization Project at Bortnichi Waste Water Treatment Plant in Kiev»Execution period: 2005-2006

Project summary:

Within the framework of the project it is planned to construct digesters for biogas generation and CHP-units for biogas utilization at the wastewater treatment system (Bortnichi WWTP).

Proposed solution includes:

1. Joint cleaning of raw sediment: and activated sludge by grids and thickening till 93% of water content.
2. Digestion in 6 digesters
3. Dewatering of digested matter by presses
Use of biogas in IC engines with power generators.

Biogas will be used for electrical and thermal energy production. Heat is used for digester heating and own company needs.
Power is also used for company own needs.

The project has three main goals:

- Reduction of greenhouse gases emission, namely methane emission, into the atmosphere and decrease of global greenhouse effect.
- Improvement of ecological conditions in nearby to wastewater treatment system areas.
- Use of biogas in CHP-units for electricity and heat production (10 MWe of power capacity and 12 MWh of thermal capacity).

Project applicant: Shimizu Corporation, Japan

Expected GHG emission reductions:

Total GHG emission reductions for the period 2008-2012, t CO2-eq/year:


Methane release prevention

Electricity displacement

Total

2008

60,000

61,000

121,000

2009

60,000

60,000

120,000

2010

60,000

58,000

118,000

2011

60,000

57,000

117,000

2012

60,000

56,000

116,000


Main parameters

Power generation

With sludge incineration plant

Total project cost, EUR

20 805 370

130 305 640

Annual operation cost (average for 2009-2020), EUR/year

3 074 050

11 278 093

Financial parameters

With ERU

Without ERU

Without ERU

Without ERU

IRR, %

-

-

-

-

NPV, EUR

-12 944 430

-14 968 697

-94 104 105

-92 092 79

Simple payback period, years

-

-

-

-

Random pair of projects

Biogas collection and utilization system at MSW landfill in Primorskiy district of Mariupol

Utilization of LFG:1-2 gas engines cogeneration of 625 kWt each, combustion in a closed flaring stack.

Read more

Installation of 1 MW straw fired boiler for heat production in Drozdy village, Kyiv oblast, Ukraine

Period: 2000 Place of implementation: Agricultural enterprise "Agrofirma DiM" Ltd., Bila Tserkva region, Kyiv oblast, Ukraine

Read more

Conference "Biomass for Energy"

Interesting at web-site


SEC "Biomass" Materials:  statistical and analytical material, articles in scientific and popular editions.

Random articles

YouTube
Facebook