Development and Commercialization of Straw Fired Boilers of 100 – 1000 kW in Ukraine

Installation of 350 kW straw-fired boiler in Stavy village

Period: 2006-2009

Place of implementation: Educational institution of the Stavy village, Kagarlyk region, Kyiv oblast, Ukaine

Financing Agency, Partners: IPP/ CRDF program; Pacific Northwest National Laboratory (PNNL), USA; U.S. Department of Energy (DOE)

Main project parameters:

Developer of boiler:

SEC “Biomass”

Manufacturer of boiler:

OJSC AK “SATER”, Ustynivka branch of “Sakhenergoservis”, Ukraine

Thermal capacity:

350 kW

Efficiency:

83%

Fuel:

big round straw bales (l=1.5 m; Ø1.8 m)

Amount of straw per load:

200-250 kg (1 big bale)

Combustion period per load:

about 3 hours

Consumption of straw:

380 t per heating season

Substitution of natural gas:

171 th. m3 per heating season

Total cost:

UAH 280 000

Payback period:

2-3 years


Random pair of projects

Promotion of renewable energies in Ukraine. Market study of Ukrainian RE sector

Period: 2004.Project partner: MVV Consultants & Engineers, Germany.

Read more

Biogas collection and utilization system at MSW landfill in Ordzonikidze district of Mariupol

Utilization of LFG:gas engine cogeneration of 635 kWt 320 JMS by production of Jenbacher (Austria), combustion in a closed flaring stack.

Read more

Conference "Biomass for Energy"

Interesting at web-site


SEC "Biomass" Materials:  statistical and analytical material, articles in scientific and popular editions.

Random articles

YouTube
Facebook