for Japan JI programExecution period: 2005-2006Project summary:Within the framework of the project it is planned to construct digesters for biogas generation and CHP-units for biogas utilization at the wastewater treatment system...
Read moreExecution period: 06–12/2009 Objective: Installation of the LFG collection wells, gas treatment system and heaters at a landfill facility in Ukraine based on LFGProject description:Project includes an installation of infrared heaters at...
Read moretel./fax (+38 044) 456-94-62
tel./fax: (+38 044) 453-28-56
e-mail:
This e-mail address is being protected from spambots. You need JavaScript enabled to view it.
8th International Conference on Biomass for Energy
— September 25-26, 2012, Kyiv, Ukraine
SEC "Biomass" Materials: statistical and analytical material, articles in scientific and popular editions.