Biogas collection and utilization system at MSW landfill in Primorskiy district of Mariupol

Utilization of LFG:
1-2 gas engines cogeneration of 625 kWt each, combustion in a closed flaring stack.
Main parameters of LFG collection system.
Number of wells: 44
Avarage LFG flow rate: 400-600 m3/h
Avarage CH4 content in LFG: 50%
Expected GHG emission reduction: 30 th. t CO2-eq/yr
Total ERUs for the period 2010-2012: 80 th. t CO2-eq
Total project costs: EUR 2.0 million
Execution period: 07-12/2009
Current status: in use

Random pair of projects

Development and Commercialization of Straw Fired Boilers of 100 – 1000 kW in Ukraine

Installation of 250 kW straw-fired boiler in Khalcha village Period: 2006-2009 Place of implementation: “Dan-Farm Ukraine” Ltd., Khalcha village, Kagarlyk region, Kyiv oblast, Ukraine

Read more

Feasibility study of «Methane Gas Utilization Project at Bortnichi Waste Water Treatment Plant in Kiev»

 for Japan JI programExecution period: 2005-2006Project summary:Within the framework of the project it is planned to construct digesters for biogas generation and CHP-units for biogas utilization at the wastewater treatment system...

Read more

Conference "Biomass for Energy"

Interesting at web-site


SEC "Biomass" Materials:  statistical and analytical material, articles in scientific and popular editions.

Random articles

YouTube
Facebook